L’Unione Europea, nonostante la posizione del Presidente degli Stati Uniti contraria agli accordi di Parigi per la limitazione delle emissioni di CO2, continua il percorso iniziato nel 1992 a Rio di Janeiro con la Conferenza delle Nazioni Unite su ambiente e sviluppo, consolidando il principio dello Sviluppo Sostenibile.

As part of the new commercial consortium that links TEAMNETWORK SRL and SEEAC SA, a ship loading facility almost new (ship loader) has been recently acquired with a load capacity of 500 t/h clinker and 200 t/h cement, already in use at the commercial port of Toulon, southern France.

Teamnetwork designs and manufactures mobile bulk loading systems for bulk materials such as cement, ground limestone or filter dust, easily adaptable to all types of storage silos.

Teamnetwork: high specialization in the field of structural renovations with mortar fiber-reinforced thixotropic.

As part of the new commercial consortium that links TEAMNETWORK SRL and SEEAC SA, a ship loading facility almost new (ship loader) has been recently acquired with a load capacity of 500 t/h clinker and 200 t/h cement, already in use at the commercial port of Toulon, southern France.